Troy and Dina reverse roles. Dina goes behind the camera and narrates as Troy begins the process of taking apart a tiled shower. The tile will be replaced by copper! Stay tuned for that reveal in a future episode.
A lesson for all is to keep tabs on sub-contractors. The only reason this remodel project is necessary is because the job was done wrong the first time. (Regular drywall was used behind the shower tile, creating a breeding ground for mold that wasn’t discovered until tile began to pop loose years later.)