Season 2, Episode 12: “Demo Day in the Shower!”

Troy and Dina reverse roles.  Dina goes behind the camera and narrates as Troy begins the process of taking apart a tiled shower.  The tile will be replaced by copper!  Stay tuned for that reveal in a future episode.

A lesson for all is to keep tabs on sub-contractors.  The only reason this remodel project is necessary is because the job was done wrong the first time.  (Regular drywall was used behind the shower tile, creating a breeding ground for mold that wasn’t discovered until tile began to pop loose years later.)